Alternative piles are created within a previously drilled borehole, thus restoring the excavated floor.After the casing is Superior to rock, the inner drill rod, down gap hammer, and bit are extracted leaving the cased gap and open up rock socket. Steel reinforcement is then decreased in the casing and into your rock socket. The opening is then tre